Referanslar

Son Projelerimiz

references

Vemarine Enerji olarak, dünya genelinde çok sayıda projede aktif rol almaktayız. Aşağıda, gerçekleştirdiğimiz önde gelen çalışmalardan bazılarını bulabilirsiniz:

  • 8 PCS WARTSILA 18V50SG ENGINE DISMANTLING AND MANTLING MECHANICAL END ELECTRICAL COMISSIONING & START-UP – MEKEL / URGENCH  
  • ENGINE BLOCK CRANKSHAFT CENTER BORING, CRANKSHAFT CHANGE – ENERJISERVICE / BAKU  
  • 10 PCS WARTSILA 20V34SG ENGINE WITH BOILER DISMANTLING -PACKING- PREPARE FOR SHIPMENT – FINMARINE / GAZIANTEP  
  • 2 PCS WARTSILA 20V34SG ENGINE WITH BOILER DISMANTLING -PACKING- PREPARE FOR SHIPMENT – FINMARINE / UŞAK  
  • 6 PCS WARTSILA 20V34SG ENGINE WITH BOILER DISMANTLING -PACKING- PREPARE FOR SHIPMENT – 11INDUSTRY / ÇORLU  
  • 2 PCS MWM TCG 2032V16 ENGINE WITH BOILER DISMANTLING -PACKING- PREPARE FOR SHIPMENT – 11INDUSTRY / ÇORLU  
  • 12 PCS WARTSILA 20V34 SG ENGINE AND TURBOCHARGER OVERHAUL 32k – KEYPOWER / TASKENT  
  • 8 PCS WARTSILA 20V34 & 18V50DF CRANKSHAFT, CRANK PIN GRINDING WITH HEAT TREATMENT – ENERJISERVICE / BAKU  
  • WARTSILA 6L32 ENGINE 32K OVERHAUL – KEYPOWER / ISTANBUL 
  • WARTSILA 6L32 ENGINE CRANKSHAFT SEAL CHANGE – REBOURN / ISTANBUL  
  • 150 PCS WARTSILA 20V34 SG ENGINECYLINDER HEAD OVERHAUL – EASYMAR / ISTANBUL  
  • 24 PCS WARTSILA 20V34 SG ENGINE INSTALLATION – KEYPOWER / TASKENT  
  • 1 PC WARTSILA 20V34 SG ENGINE MECHANICAL AND ELECTRICAL COMMISSIONING & START-UP – AKKIM ENERJI 
  • 4 PCS WARTSILA 9L34DF ENGINE OPERATION & MANAGEMENT – MED ENERJİ – MİKANO / ABUJA NIGERIA  
  • 2 PCS WARTSILA 18V32LN 48K OVERHAUL – KURSHE CEMENT / ALBANIA 
  • 1 PC WARTSILA 18V34SG MONTAGE AND COMISSIONING- AKBAŞLAR TEKSTİL 
  • WARTSILA ENPA SUBCONTRACTOR – 2019 – 2020  
  • WARTSILA FINLAND SUBCONTRACTOR – 11 INDUSTRY – 2021-2024 
  • 3PCS WARTSILA 18V50SG MAINTENANCE – MOSB ENERJİ 
  • MAINTENANCE AGREMEEENT – CUSERV INTERNATIONAL PORTO RICO  
  • 55 PCS WARTSILA ENGINE 34SG/50DF MAINTENANCE & REPAIR AGREMEENT – AZAR ENEGRY 
  • 5 PCS WARTSILA 20V34DF FULL EPC INSTALATION – 11INDUSTRY / ANTIGUA 
  • 4000 CBM LNG RE-GASIFICATION TERMINAL INSTALLATION – 11 INDUSTRY / ANTIGUA 
  • 1 PC WARTSILA 20V34 SG FULL EPC INSTALATION – 11INDUSTRY / TURK & KAYIKOS ISLAND 
  • 5 PCS WARTSILA 20V34SG 40 MW POWER PLANT ENGINE RE-LOCATED – 11INDUSTRY/ KEMALPAŞA 
  • 6 PCS WARTSILA 20V34SG 60 MW POWER PLANT RE-LOCATION - 11INDUSTRY/ BULGARİSTAN 
  • 3 PCS WARTSILA 18V38A 20 MW POWER PLANT RE-LOCATION – KARADENİZ ENERJİ / SİLOPİ 

Referanslarımız